About this information
Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).
If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.
*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.
Download datasets of the summaries of completed access to information requests.
Current Search
Report Type
Organization
Disposition
Year
Month
Found 12 record(s)
Req # A-2022-00110
All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in December 2022.Organization: Canadian Nuclear Safety Commission
May 2023
Req # A-2022-00111
Copies of the following reports issued to the CNSC in the period from January 1, 2022 to December 31, 2022, including: 1- Detailed Event Reports (DERs) for events occurring in all units of the Darlington Nuclear Generating Station (NGS), Pickering NGS, Bruce NGS and Point Lepreau NGS. 2- The IAEA IRS International Event Reports. All of the above reports reside in the CERTs database system.Organization: Canadian Nuclear Safety Commission
May 2023
Req # A-2022-00145
All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in February 2023.Organization: Canadian Nuclear Safety Commission
May 2023
Req # A-2023-00005
I'm looking for a copy of the contract with GC Strategies Inc and reason for the their refunding of the contract. Procurement Identification Number: 3000696607 Description: "Competitive contract against a supply arrangement for a Data Conversion Specialist" Contract date: Sep 26, 2019Organization: Canadian Nuclear Safety Commission
May 2023
Req # A-2021-00119
All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in December 2021.Organization: Canadian Nuclear Safety Commission
May 2022
Req # A-2022-00001
Please provide the following briefing notes, by email or ePost if possible: * 6740534 — "The Regulator’s Perspective for Deploying SMRs" * 6728515 — "Response to Letter writing campaign"Organization: Canadian Nuclear Safety Commission
May 2022
Req # A-2020-00187
January 1, 2019 to present (February 19, 2021) records (BMD's/test results/incident reports/ briefing notes/Q’s and A’s, memos) assessing/monitoring nuclear waste storage capacities and problems at Canadian sites (Ontario/New Brunswick) reactor or uranium industry sites). Include reports of viability of nuclear waste holding pools and of spent fuel caskets/canisters viability at those sites. Include any such records for Canadian generated nuclear waste storage and problems being stored or contemplated being stored at foreign sites, and assessment of those storage facilities and plans.Organization: Canadian Nuclear Safety Commission
May 2021
Req # A-2020-00195
A list of action items produced by the CNSC’s Executive Committee in January 2021. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Committee has been briefed on in January 2021. Also include meeting minutes or agendas.Organization: Canadian Nuclear Safety Commission
May 2021
Req # A-2020-00201
DONE on March 6, 2021, 5:37 The following is regarding a Reportable Event (RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. Documentation required: Review documentation of Standby Power System Electrical Protection scheme (Relay Protection). Implementation Measures required to improve reliability. IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information and create an Action Item: We require that you provide the following documents: 1) Action Item Number created by the Country Coordinator (Canada, Mr. Ben Poulet, CNSC Staff) for both items. 2) Action Item Number Database Screen Shot of both Action Items. 3) Review documentation of Standby Power System Electrical Protection scheme (Relay Protection). 4) Provide Edoc Number for Review Documentation. 5) Implementation Measures of Standby Power documentation that was identified to improve reliability and have been proposed in relicensing documentation. Provide Edoc Number of Implementation documentation. Provide Edoc Number of the Licensing documents that include the implementation scheme.Organization: Canadian Nuclear Safety Commission
May 2021
Req # A-2020-00206
1. Any communications between Marie-Pierre Grondin, Hugh Robertson, HR, Caroline Ducros, or any one else related to staffing the two-year assignment to replace Ananda Senathirajah as Senior Project Officer leading the Management System (Navigator) file. 2. All HR policies and sanctioned processes related to staffing a unionized assignment position. 3. Any and all messaging or other communications from, to, or between any of the following parties, separately or together: Raoul Awad, Ross Richardson, Marie-Pierre Grondin, Hugh Robertson, and Ramzi Jamal, that include reference to me ([name withheld]). 4. Any and all messaging or other communications from, to, or between any of the following parties, separately or together: Marie-Pierre Grondin, Hugh Robertson, and Josee Stone, regarding my role in implementing the outstanding improvements to the management system that EC approved after [personal information withheld].Organization: Canadian Nuclear Safety Commission