Informal Request for ATI Records Previously Released

Organization: Canadian Nuclear Safety Commission

Year: 2020

Month: July

Request Number: A-2020-00022

Request Summary: 2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers; including DO(s)’ Design Intent(s); Titles, Names, and P. Eng. affiliations, P. Eng. Numbers, of the ISTB System Design Engineers; DO(s), title, name, and P. Eng. Number, of the ISTB System; and DO(s) of the ISTB System when the System was Commissioned; and was deemed Ready to Operate (RTO). Blackout Period: between August 14–28, 2003, beginning just after 4:10 p.m. EDT.

Disposition: No records exist

Number of pages: 0

Date modified: