Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 14 record(s)

Req # A-2019-00126

Confirmation documents (2): emails, for example, that Gentilly II Power Division Director (1), such as Mr. F. Rinfret, and all Gentilly II Power Division staff members (2) have received the following reports: Preliminary Report, Request 1 Gentilly II CNSC Site Office Inspector Reports, Request 2 and Request 3 and Detailed Report, Request 4. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2019-00145

Confirmation document, email sent to the CNSC Secretariat, Mr. M. Leblanc, that the Gentilly II Integrated Safety Review (ISR) received after October 27, 2009 included a reference to Gentilly II October 27, 2009 Event.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2019-00146

Confirmation document, email(s) sent that included the Preliminary Event Report and Detailed Event Report, for an event that occurred at Gentilly II Nuclear Power Station on October 27, 2009, to the Licensing Technical Specialist(s) that prepared any Commission Member Document (CMD) for Gentilly II Nuclear Power Plan licensing application(s) for the period that the event that occurred October 27, 2009, and after that period.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00005

CNSC ISTB Preliminary Report for Event Reports and Reportable Events PNGS A & PNGS B COMMON SYSTEMS OPERATOR PRELIMINARY EVENT REPORT OR REPORTABLE EVENT REPORTED BY CNSC PNGS A AND B SITE OFFICE TO CNSC STAFF THAT WAS REPORTED ON BLACKOUT DATE OR SHORTLY AFTER THE BLACKOUT DATE AROUND AUGUST 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00006

For PNGS A. PNGS B, and PNG A and B Complex (Common Systems) During the Blackout Periods of August 14th-28th, 2003; ISTB Operation Manual(s) or ISTB Design Manual(s) ISTB Operation Manual and Training Documentation ISTB Design Manual ISTB Design Manual Changes ISTB Operation Manual Changes and Training Documentation, and ISTB Training Material Changes following Design Manual and Operation Manual changes.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00009

ISTB System Engineer (SE) Titles at PNGS A. PNGS B, and PNG A and B Complex (Common Systems) For the ISTB System in place at the time of the Blackout (August 14-28th, 2003), please provide the following information: ISTB System Engineer Titles that were assigned to managed all engineering issues related to the ISTB and directly related systems, including Station Blackout for PNGS A, PNGS B, and PNG A and B.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00010

ISTB System Engineer Training Program For the ISTB System in place at the time of the Blackout (August 14-23, 2003), please provide the following information: SAT Tasks Analysis, Training Material, Simulator Training Material, Simulator Training scenarios, Simulator Training Software Testing and Approval for Certified Staff, such as: ANO PNGS A, ANO PNGS B, and ANO of Common Systems; Training Exercise documentation, including frequency, feedback, SCR stemming from Training Exercises, ISTB Availability Records prior to the Blackout, All PNGS A and PNGS B Training Program Assessments, CAP, and titles of the CNSC Staff that accepted the CAP(s) and the CAP(s) Completion and Assessment of effectiveness, and OPG Self-Assessment(s) of the Engineering Training and Engineering Function at OPG.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00013

Neutronic Power and Thermal Power For PNGS A and PNGS B: Immediately preceding the Blackout, Neutronic Power plot, and Immediately after the beginning of the Blackout for the following week, Neutronic Power plot. Immediately preceding the Blackout, Thermal Power plot, and Immediately after the beginning of the Blackout for the following week, Thermal Power plot. Blackout Dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00015

ISTB Commissioning Testing Results Including Voltage, Current, and Loading Measurements For the ISTB System in-place at the time of the Blackout, the Plotted Data, i. e. Print Outs of Voltage, Current, and Loading Measurements; maximum transfer of power (MW and MVA) from one NPP to the another NPP. Blackout dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00016

Final decisions for ATO, including context and restrictions, documentation, approvals, and authorizations for the ISTB System in-place at the time of the Blackout. Final decision for AFS, including restrictions, Engineers comments, and identified risk(s), documentation and authorizations. Final decision for AFS sent to OPG Power Central dispatch for Spinning Reserve assessments, and Bulk Electricity Supply stability assessments. Blackout Dates August 14th-28th, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020
Date modified: