About this information
Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).
If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.
*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.
Download datasets of the summaries of completed access to information requests.
Current Search
Report Type
Organization
Disposition
Year
Month
Found 282 record(s)
Req # A-2023-00012
We are hoping to make a request for any records relating to the property located at/near 49 Pineway Boulevard, located in North York, Ontario. The Site is located at Part of Lot 21, Concession 2, York Township (North York/Toronto). See attached map for additional location details. The Site is currently occupied by a TNPI pumping station. Possible other pipelines exist running through the Site. We want any filed reports (like Notice of Contaminations (NOCs)), incident reports, etc.), any spill reports, and any other environmental reports. There may be Stantec reports identified during the search; we do not need copies of these reports but would appreciate a list if possible. We will take copies of all the other reports identified during the search. Preference can be given to the last 20 years if that helps.Organization: Canada Energy Regulator
May 2024
Req # A-2023-00050
For the time frame January 1 , 2008 to November 30, 2020 All records relating to submissions, and subsequent disclosure, of seismic information, maps, and reports, regardless of form, pertaining to data that was the original Operator codes 528, 838, GOO5, 833, HO33, C137, W27 such secondary submissions of GSI data, are limited to SUBMISSIONS MADE BY Encana, Ovintive, Imperial Oil Limited, Exxon Mobil Canada Limited, Conoco Phillips Canada Resouces Corp or any submitter name containing the words Conoco Imperial or Exxon, Encana, Ovintive.Organization: Canada Energy Regulator
May 2024
Req # A-2017-00064
All briefing notes, memos, talking points prepared by or for Peter Watson or prepared by or for Josée Touchette between June 1, 2017 and the date that the NEB begins processing this request regarding or related to the modernization of the NEB.Organization: Canada Energy Regulator
March 2024
Req # A-2023-00083
Electronic copies of the (1) currently in place and (2) proposed revision to the Preliminary Decommissioning Plan (PDP) for Cameco's Port Hope Conversion Facility and any correspondence regarding the public release of the proposed revision to the PDP (from September 1 2023-Jan 13, 2024).Organization: Canadian Nuclear Safety Commission
March 2024
Req # A-2023-00089
All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in October 2023.Organization: Canadian Nuclear Safety Commission
March 2024
Req # A-2023-00098
A list of action items produced by the CNSC’s Executive Team in November 2023. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Team has been briefed on in November 2023. Also include meeting minutes or agendas.Organization: Canadian Nuclear Safety Commission
March 2024
Req # A-2023-00099
A list of action items produced by the CNSC’s Executive Team in December 2023. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Team has been briefed on in December 2023. Also include meeting minutes or agendas.Organization: Canadian Nuclear Safety Commission
March 2024
Req # A-2023-00107
Obtain an electronic copy of the following document: E-Doc# 5148136: Titled, "Independent Review of CNSC Regulatory Disposition of Intervenor's Issues"Organization: Canadian Nuclear Safety Commission
March 2024
Req # A-2023-00118
Please provide copies of the following briefing notes, providing interim disclosure as each is finalized for release: * 7025252 — Recommendation to withdraw from Sustainable Network for Independent Technical EXpertise on radioactive waste management (SITEX_Network) * 7160478 — CNSC Readiness to Regulate Enabling the deployment of safe nuclear projects * 7176466 — Options for Efficiencies in Reviewing Proposed Nuclear Projects * 7208799 — Future-Oriented Statement of OperationsOrganization: Canadian Nuclear Safety Commission
March 2024
Req # A-2021-00116
Provide from Jan 1, 2018 to present, records, including studies, evaluations, timetables, costs, risks involved in nuclear reactor decommissioning. Include reviews, lessons learned of the decommissioning efforts at decommissioning sites (Gentilly 1 and 2); at mothballed reactor units (in Ontario). Include the costs, containment problems in keeping nuclear wastes at decommissioned sites. Include upcoming potential decommissioning of reactors/units (at Pickering/elsewhere) or the option of further extended the life of such reactors/units (at Pickering/elsewhere) with conditions.Organization: Canadian Nuclear Safety Commission