Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 260 record(s)

Req # A 2021_0007

All records and correspondence related to the scheduling of the 2021 Annual Public Meeting (APM), including but not limited to: - setting the dates of the APM; - setting the format of the APM; - setting the time limits for submitting questions to the APM; - posting notices of the APM on the CDEV website; and - correspondence following the 2020 APM related to the 2021 APM. This request is for records between November 17, 2020 to November 17, 2021

Organization: Canada Development Investment Corporation

41 page(s)
April 2022

Req # A 2021_0009

All emails, reports, emergency calls, communications, photos and videos regarding the recent November 15-25 2021 flood and slide events in the Coquihalla valley including Merritt and Sumas and all points in between that pertains to TMX operations including maintenance and construction

Organization: Canada Development Investment Corporation

4 page(s)
April 2022

Req # A-2020-00184

Copies of the AECB- Confidential -Significant Development Reports from 1942 to the CNSC version of those reports until 1990. If they could be in PDF form and sent by disk or thumb drive that would idea. I am also seeking copies of reports and briefing notes sent to/by Dr. J.H. Aitken (Ontario Ministry of Labour from 1975 to 1985).

Organization: Canadian Nuclear Safety Commission

1929 page(s)
April 2022

Req # A-2020-00204

• All documents in the CNSC’s possession that contain any information, discussion or data pertaining to the pick up of hydrogen and/or deuterium by pressure tubes in CANDU reactors at the Pickering, Bruce and Darlington nuclear stations. • All documents that contain any mention of the so-called Design Equation used in predictive models of the corrosion of, and deuterium ingress into Zr-2.5Nb pressure tubes. • The documents should cover all data obtained in the period 2000 to 2021 through so-called scrape campaigns, or from measurements on removed pressure tubes. • The documents provided should include all reported examples of the following information: (i) The reactor and fuel channel identifier for which the sample data were obtained (ii) The in-reactor exposure time, expressed in effective full power hours or years, and the equivalent exposure hot hours (iii) The axial position of the sample as measured from the pressure tube inlet end (iv) The measured deuterium concentration expressed in units of mg/kg An example of the type and format of the data requested may be found in the July 1998 Report: Review and Predictions of Corrosion and Deuterium Uptake in the Body of Operating Reactor Pressure Tubes, OH Report No. A-FC-97-113-P or AECL Report No. 00-31100-200-005.

Organization: Canadian Nuclear Safety Commission

3324 page(s)
April 2022

Req # A-2021-00021

Employment equity statistics

Organization: Canadian Nuclear Safety Commission

1842 page(s)
April 2022

Req # A-2021-00029

It is stated in one of the CANDU PHWR safety reports that in the 1970s and 1980s, some pressure tubes were removed from Pickering Units 3 and 4 and Bruce Unit 2 because of leakage at through-wall DHC cracks in rolled joints that had high residual stresses. Can you please provide evidence that this information was provided to the Commission members and the public during relicensing hearings for the respective plants. Can you also please provide data, internal and external reports, internal and external correspondence on all pressure tubes that were prematurely removed from service from all CANDU PHWRs, both in Canada and overseas. Please also provide criteria that were used to remove pressure tubes from service prior to retubing. Please also include crack and deformation data on pressure tubes that were noted to have smaller cracks but were not removed from service.

Organization: Canadian Nuclear Safety Commission

1472 page(s)
April 2022

Req # A-2021-00118

A list of action items produced by the CNSC’s Executive Committee in December 2021. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Committee has been briefed on in December 2021. Also include meeting minutes or agendas.

Organization: Canadian Nuclear Safety Commission

140 page(s)
April 2022

Req # A-2021-00129

All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in January 2022.

Organization: Canadian Nuclear Safety Commission

187 page(s)
April 2022

Req # A-2021-00130

A list of action items produced by the CNSC’s Executive Committee in January 2022. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Committee has been briefed on in January 2022. Also include meeting minutes or agendas.

Organization: Canadian Nuclear Safety Commission

69 page(s)
April 2022

Req # A-2021-00123

Please provide all notes, emails, letters, requests, contracts and all other documents related to the procurement of COVID rapid tests from Bruce Power, including cost and how any payments were made.

Organization: Canadian Nuclear Safety Commission

45 page(s)
March 2022
Date modified: