Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 83 record(s)

Req # A-2021-00026

Seeking records describing the criteria and conditions, as well as the authority of the NCC to change the criteria and conditions associated with the rezoned block of land that is/was in the NILM (1 and 19 Sir John A MacDonald Parkway).

Organization: National Capital Commission

846 page(s)
April 2021

Req # A-2021-00028

Please provide all reports, complete with all annexes and attachments, prepared by Fotenn that describe all the options for 1 and 19 Sir John A. Macdonald Parkway.

Organization: National Capital Commission

32 page(s)
April 2021

Req # A-2021-00040

Please provide the "prepared documentation" showing the actual expenditures for 3 projects from 2016 to 2021: Rehabilitation project for Cottage main building, Farmhouse building, and Lower guest cottage.

Organization: National Capital Commission

1 page(s)
April 2021

Req # A-2021-00042

A list of all rights of way in Gatineau Park that the NCC has granted to Gatineau Park residents or any natural or legal person since 1970; minutes of all board meetings and most recent NCC policies/guidelines regarding the granting of rights of way.

Organization: National Capital Commission

13 page(s)
April 2021

Req # A-2021-00050

Please provide the agendas and minutes for the meeting of the Advisory Committee on the Official Residences of Canada on November 11, 2020.

Organization: National Capital Commission

0 page(s)
April 2021

Req # A-2021-00051

Please provide the agendas and minutes for the meeting of the Advisory Committee on the Official Residences of Canada on February 11, 2021.

Organization: National Capital Commission

0 page(s)
April 2021

Req # A-2019-00130

Confirmation document, email sent to the Technical Specialist(s) covering the Safety Areas mentioned in the Detailed Event Report for the event that occurred 27 October, 2009, at Gentilly II Nuclear Power Plant for the following three instances, id es: (i) Safety Areas covering: (ii) Shutdown Systems and Safety Systems, and (iii) Training Program(s).

Organization: Canadian Nuclear Safety Commission

0 page(s)
April 2020

Req # A-2019-00132

Clarified text on April 17, 2020: Emails were to be sent to Specialist(s), as follows: Safety Systems, Training Programs, Human Factors, and Quality Assurance. The causes identified in the preliminary and detailed reports describes a minimum number of specialist(s) that should have been informed via email of the Event by providing to them the R-99. We are reiterating our requests, as follows: Emails that forwarded the R-99 to specialists, Proof of receipt of emails to specialist, title of Experts, and Division to which they were attached to. In addition, kindly provide the ID Tag Number( specific identification, unique number) of the failed relay. Original text: Confirmation document, email, containing at least two Reports were sent to the Technical Specialist(s) covering Maintenance Program (Relays), deemed qualified, and preparing the Gentillly II Nuclear Power Plant Integrated Safety Review (ISR) mandated by the IAEA; the two Reports are, as follows: Preliminary Event Report and the Detailed Event Report ; these two Reports covered the event that occurred on 27 October, 2009, at Gentilly II Nuclear Power Plant.

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00131

Confirmation document, email, containing at least two Reports were sent to the Technical Specialist(s) covering Shutdown System(s) and Safety Systems, deemed qualified, and preparing the Gentillly II Nuclear Power Plant Integrated Safety Review (ISR) mandated by the IAEA; the two Reports are, as follows: Preliminary Event Report and the Detailed Event Report ; these two Reports covered the event that occurred on 27 October, 2009, at Gentilly II Nuclear Power Plant.

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00103

Provide January 1, 2019 to present, review of the handling work of Canada’s federally-owned radioactive waste by a private-sector consortium and options to consider as the renewal date in 2021 is near, including other options that store radioactive waste away from drinking water sources. Include permits given and rationales for and risk assessments done for transporting radioactive wastes to Chalk River and other sites, and to storing wastes at Chalk River. Include as well results to date from an environmental review of Global First Power plans for modular reactor at Chalk River and questions CNSC sent to them in the last 3 months.

Organization: Canadian Nuclear Safety Commission

103 page(s)
April 2020
Date modified: