Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 11614 record(s)

Req # A-2019-00131

Confirmation document, email, containing at least two Reports were sent to the Technical Specialist(s) covering Shutdown System(s) and Safety Systems, deemed qualified, and preparing the Gentillly II Nuclear Power Plant Integrated Safety Review (ISR) mandated by the IAEA; the two Reports are, as follows: Preliminary Event Report and the Detailed Event Report ; these two Reports covered the event that occurred on 27 October, 2009, at Gentilly II Nuclear Power Plant.

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00103

Provide January 1, 2019 to present, review of the handling work of Canada’s federally-owned radioactive waste by a private-sector consortium and options to consider as the renewal date in 2021 is near, including other options that store radioactive waste away from drinking water sources. Include permits given and rationales for and risk assessments done for transporting radioactive wastes to Chalk River and other sites, and to storing wastes at Chalk River. Include as well results to date from an environmental review of Global First Power plans for modular reactor at Chalk River and questions CNSC sent to them in the last 3 months.

Organization: Canadian Nuclear Safety Commission

103 page(s)
April 2020

Req # A-2019-00108

All records provided to or created by the president regarding the Pickering nuclear generating station from Jan. 1, 2020 to the date this request was received.

Organization: Canadian Nuclear Safety Commission

33 page(s)
April 2020

Req # A-2019-00123

For the years 2007 and 2008, the Gentilly II CNSC Site Office Inspector Report regarding the Gentilly II Nuclear Power Plant activities for years 2007 and 2008. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

451 page(s)
April 2020

Req # A-2019-00125

Detailed Report filed at Gentilly II CNSC Site Office or provided to any CNSC Officer about events that occurred on October 27, 2009. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

2 page(s)
April 2020

Req # A-2019-00129

Confirmation documents: emails, for example that the Power Division Director General has received the 2009-2010 Gentilly II Annual Report contribution by the Director of Gentilly II Nuclear Power Division or Mr. F. Rinfret. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

0 page(s)
April 2020

Req # A-2019-00133

Confirmation document, email, containing at least two Reports were sent to the Technical Specialist(s) covering Training Program(s), deemed qualified, and preparing the Gentillly II Nuclear Power Plant Integrated Safety Review (ISR) mandated by the IAEA; the two Reports are, as follows: Preliminary Event Report and the Detailed Event Report ; these two Reports covered the event that occurred on 27 October, 2009, at Gentilly II Nuclear Power Plant.

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00135

List of early notification for 2009, regarding only Gentilly II Nuclear Power Plant, in the Canadian Nuclear Safety commission 2009-10 Annual Report, Figure 3: Early notification reports for nuclear power plants, Page 40. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

9 page(s)
April 2020

Req # A-2019-00161

I am requesting information held by the Canadian Nuclear Safety Commission in relation to the planning and execution of engagement with Indigenous communities for the Canadian Small Modular Nuclear Roadmap (hereinafter the Roadmap). Our request includes, but is not limited to, documents/communications/data/reports/briefing notes relating to; - The selection process and criteria used to determine which Indigenous communities would be involved in initial dialogue - A list of Indigenous organizations and communities and other groups that were involved in initial dialogue - The selection process and criteria used to determine which Indigenous organizations, communities and groups would be invited to the Indigenous engagement sessions - A list of Indigenous organizations and communities and other groups invited to participate in Indigenous engagements sessions - A list of Indigenous communities and other groups that participated in the Roadmap - Any guidelines, briefing notes, presentations, reports or notes taken, in relation to the Indigenous engagement sessions - Funding that was provided/offered to Indigenous communities to enable participation in the Roadmap - All documentation that was provided to Indigenous communities, organizations and groups (this includes proponents and other representatives or groups who were present during Indigenous engagement sessions).

Organization: Canadian Nuclear Safety Commission

5 page(s)
April 2020

Req # A-2019-00162

2450 Neyagawa Blvd. Oakville, ON L6H 7P4 Please conduct a file search for the Property and advise if you have record of any nuclear substances, work orders, deficiency notices, violations, remedial orders, or any other outstanding requirements with respect to the Property and its surrounding soil and groundwater. Please also advise if the Property is within 76 meters of a nuclear reactor, particle accelerator, uranium or thorium mill, a facility for processing nuclear reactor fuel, or any facility that produces, disposes, or otherwise possesses radioactive prescribed substances or materials as described in the Nuclear Safety and Control Act and the Atomic Energy Control Act.

Organization: Canadian Nuclear Safety Commission

0 page(s)
April 2020
Date modified: