Northwest Greater Toronto Area transmission corridor study area

Northwest Greater Toronto Area transmission corridor study area Get mapping data related to the Northwest Greater Toronto Area Transmission Corridor Identification Study. In June 2019, the Ministry of Energy, Northern Development and Mines along with Ontario’s electricity system planner, the Independent Electricity System Operator, launched the Northwest GTA Transmission Corridor Identification Study to identify an appropriate corridor of land for use by future power lines if and when the need arises. The shapefiles available for download outline the outer boundaries for: * the Northwest GTA Transmission Corridor Identification Study area, announced in June 2019 * the Northwest GTA Transmission Corridor Narrowed Area of Interest, announced in September 2019 * The Northwest GTA Transmission Corridor 2020 Narrowed Area of Interest, announced in November 2020 2024-05-15 Government of Ontario Economics and IndustryEconomy and BusinessEnvironment and Natural ResourcesGovernment information Original metadata (https://data.ontario.ca)HTML https://data.ontario.ca/dataset/5ba2da6f-5636-4e59-b65a-799904ba4a47 Original metadata (https://data.ontario.ca/fr)HTML https://data.ontario.ca/fr/dataset/5ba2da6f-5636-4e59-b65a-799904ba4a47 2019: Preliminary Transmission Corridor Study AreaKML https://data.ontario.ca/dataset/5ba2da6f-5636-4e59-b65a-799904ba4a47/resource/909d01a5-eddf-42d6-b716-a4665942f2a7/download/current_transmission_corridor_study_area.kml 2019: Narrowed Area of InterestKML https://data.ontario.ca/dataset/5ba2da6f-5636-4e59-b65a-799904ba4a47/resource/bf3daca2-176f-4ef2-98ba-bb29be7cf20e/download/narrowed_area_of_interest.kml 2020: Narrowed Area of InterestKML https://data.ontario.ca/dataset/5ba2da6f-5636-4e59-b65a-799904ba4a47/resource/05f22451-657d-444e-b768-dfd80d09fd06/download/2020_narrowed_area_of_interest.kml

Get mapping data related to the Northwest Greater Toronto Area Transmission Corridor Identification Study. In June 2019, the Ministry of Energy, Northern Development and Mines along with Ontario’s electricity system planner, the Independent Electricity System Operator, launched the Northwest GTA Transmission Corridor Identification Study to identify an appropriate corridor of land for use by future power lines if and when the need arises. The shapefiles available for download outline the outer boundaries for: * the Northwest GTA Transmission Corridor Identification Study area, announced in June 2019 * the Northwest GTA Transmission Corridor Narrowed Area of Interest, announced in September 2019 * The Northwest GTA Transmission Corridor 2020 Narrowed Area of Interest, announced in November 2020

Made available by the Government of Ontario

These resources are not under the control of the Government of Canada and the link is provided solely for the convenience of our website visitors. We are not responsible for the accuracy, currency or reliability of the content of this website. The Government of Canada does not offer any guarantee in that regard and is not responsible for the information found through this link.

Visitors should also be aware that information offered by this non-Government of Canada site is not subject to the Privacy Act or the Official Languages Act and may not be accessible to persons with disabilities. The information offered may be available only in the language used by the site. With respect to privacy, visitors should research the privacy policies of this non-government website before providing personal information.

Data and Resources

Contact Information

Similar records