Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 232 record(s)

Req # A-2020-00022

2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers; including DO(s)’ Design Intent(s); Titles, Names, and P. Eng. affiliations, P. Eng. Numbers, of the ISTB System Design Engineers; DO(s), title, name, and P. Eng. Number, of the ISTB System; and DO(s) of the ISTB System when the System was Commissioned; and was deemed Ready to Operate (RTO). Blackout Period: between August 14–28, 2003, beginning just after 4:10 p.m. EDT.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00023

3.0 ISTB DESIGN OWNERSHIP TURNOVER BETWEEN AECL AND SNC LAVALLIN List of AECL Design Engineers’ titles and OPG ISTB Design Engineers’ titles at the time of the ISTB Design change of ownership occurred and after the Blackout dates of August 14-28th, 2003; ISTB Design ownership change date; ISTB Design Turnovers documentation exchange list, including Design Intent(s), between ISTB System DEs; please include DE Titles, Names, and P. Eng. affiliations, and P. Eng. Numbers, of the Design Engineers.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00010

Records related to CADOR 217O0119

Organization: Transportation Safety Board of Canada

12 page(s)
July 2020

Req # A-2020-00014

Records from Jan 2015 to present regarding the intersection of King's Hill Road and Bennett's Road in Portugal Cove-St. Philip's.

Organization: Transportation Safety Board of Canada

0 page(s)
July 2020

Req # A-2020-00017

Identité d'une épave situé au nord de l'île Blanche, fleuve Saint-Laurent, Québec, dont la présence est indiquée sur les cartes marines, selon un article du Soleil du 17 juin 1949, page 17, s'agissant d'une grue mécanique flottante "Muscallonge" dont la barge qui la remorquait - nommée "International" - aurait été victime d'une collision avec le Sein, navire français de la Compagnie générale transatlantique de Paris, en 1949, fournir le rapport d'enquête le cas échéant ou tout autre document permettant de valider l'identité de l'épave en question.

Organization: Transportation Safety Board of Canada

0 page(s)
July 2020

Req # A-2020-00019

Records pertaining to real world use of airplanes in Canadian airspace to conduct experiments or routine operations related to solar radiation management (SRM), sometimes called SAI (stratospheric aerosol injection)

Organization: Transportation Safety Board of Canada

0 page(s)
July 2020

Req # A-2019-00076

provide all briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the president in 2019.

Organization: Canadian Nuclear Safety Commission

1299 page(s)
June 2020

Req # A-2019-00112

Any documents, correspondence and materials related to Plutonium found in the sewage lagoon of AECL's Whiteshell Laboratories during the timeframe of 2000-2020. Originally documented on (p.4-26) from CNL’s Annual Compliance Monitoring Report 2018 Progress Report on the Environmental Assessment Follow-Up Program for Whiteshell Laboratories Whiteshell Site Documentation.

Organization: Canadian Nuclear Safety Commission

1484 page(s)
June 2020

Req # A-2019-00128

Confirmation documents (2): for example, database printout that includes the Preliminary Event Details, CNSC Officer Title that entered the data, and the date of entry of Preliminary Event Details information, that the Directorate of Nuclear Cycle and Facilities Regulation Director General, such as Mr. P. Elder, Director General, and any of the Directorate staff members or the staff members working under the Vice President Technical Support and Chief Science Officer, had had access to via CNSC CERTS Database Preliminary Report for the event that occurred on October 27, 2009 at Gentilly II Nuclear Power Plant. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

2 page(s)
June 2020

Req # A-2019-00152

Please provide all briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the president in January 2020.

Organization: Canadian Nuclear Safety Commission

186 page(s)
June 2020
Date modified: