Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 121 record(s)

Req # A-2020-00013

Neutronic Power and Thermal Power For PNGS A and PNGS B: Immediately preceding the Blackout, Neutronic Power plot, and Immediately after the beginning of the Blackout for the following week, Neutronic Power plot. Immediately preceding the Blackout, Thermal Power plot, and Immediately after the beginning of the Blackout for the following week, Thermal Power plot. Blackout Dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00015

ISTB Commissioning Testing Results Including Voltage, Current, and Loading Measurements For the ISTB System in-place at the time of the Blackout, the Plotted Data, i. e. Print Outs of Voltage, Current, and Loading Measurements; maximum transfer of power (MW and MVA) from one NPP to the another NPP. Blackout dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00016

Final decisions for ATO, including context and restrictions, documentation, approvals, and authorizations for the ISTB System in-place at the time of the Blackout. Final decision for AFS, including restrictions, Engineers comments, and identified risk(s), documentation and authorizations. Final decision for AFS sent to OPG Power Central dispatch for Spinning Reserve assessments, and Bulk Electricity Supply stability assessments. Blackout Dates August 14th-28th, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00020

ISTB Engineering Change Requests Assessments, including comments, that were Rejected Over the entire ISTB System lifetime, the Rejected ISTB Engineering Change Request Assessments, including Assessors comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00021

ISTB Engineering Change Request Assessments, including comments, that were Accepted Over the entire ISTB System lifetime, the Accepted ISTB Engineering Change Notice Request Assessments, including comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Notice Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00022

2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers; including DO(s)’ Design Intent(s); Titles, Names, and P. Eng. affiliations, P. Eng. Numbers, of the ISTB System Design Engineers; DO(s), title, name, and P. Eng. Number, of the ISTB System; and DO(s) of the ISTB System when the System was Commissioned; and was deemed Ready to Operate (RTO). Blackout Period: between August 14–28, 2003, beginning just after 4:10 p.m. EDT.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00023

3.0 ISTB DESIGN OWNERSHIP TURNOVER BETWEEN AECL AND SNC LAVALLIN List of AECL Design Engineers’ titles and OPG ISTB Design Engineers’ titles at the time of the ISTB Design change of ownership occurred and after the Blackout dates of August 14-28th, 2003; ISTB Design ownership change date; ISTB Design Turnovers documentation exchange list, including Design Intent(s), between ISTB System DEs; please include DE Titles, Names, and P. Eng. affiliations, and P. Eng. Numbers, of the Design Engineers.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2019-00102

Any briefing materials (i.e. briefing notes, decks) regarding radioactivity of brine extracted through hydraulic fracturing and the health and safety implications of the same from January 2018 to January 2020. Please send digital copies of all correspondence (acknowledgment and any required notices of extension) as well as hard copies.

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020

Req # A-2019-00109

All records provided to or created by the president regarding nuclear power plant refurbishment from Nov. 10, 2019 to the date this request was received.

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020

Req # A-2019-00110

Royal Bank of Canada (the "Lender") l/t Branthaven Marz Inc. (the "Borrower/Registered Owner") 121 Highway 8, Hamilton. Ontario L8G 1C1 being Part of Lot 2, Plan 772 being Part 1, Plan 62R-20609 save and except Part 3, Plan 62R-12432, Hamilton, Ontario as described in PIN 17315-0313 (LT) (the "Property") Roll No.: 2518050 - 47105100 Closing Date: As soon as possible We would like to request a records search pursuant to the Access to Information Act. Please conduct a file search for the Property and advise if you have record of any nuclear substances, work orders, deficiency notices, violations, remedial orders, or any other outstanding requirements with respect to the Property and its surrounding soil and groundwater. Please also advise if the Property is in close proximity (within 76 meters) to a nuclear reactor, particle accelerator, uranium or thorium mill, a facility for processing nuclear reactor fuel, or any facility that produces, disposes, or otherwise possesses radioactive prescribed substances or materials as described in the Nuclear Safety and Control Act and the Atomic Energy Control Act. Our File No.: 3933 227

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020
Date modified: