Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 605 record(s)

Req # A-2020-00197

The following is regarding a Reportable Event that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. The following was required by the IAEA Staff from the IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) or the CNSC Staff: Conduct a Trend Analysis: IAEA Staff required that a for the be provide to IAEA Staff and the Trend Analysis be circulated to CNSC Staff. We kindly request the following information be provided to us in the same format, in five Sections, and as soon as the Section information is available: Five Information Sections 1a) Please provide conducted Trend Analysis. And provide the Trend Analysis data collected for the year 2000-2010 period. And provide the Trend Analysis circulation documentation and the scope of circulation. 1b) And the Trend Analysis data collected via the NPP Quality Program, Analysis Timeline, and reports shared with CANDU Owners Group, including Pointe Lepreau Nuclear Power Plant Management and Owners. 1c) And the IAEA Country Coordinator (Canada, CNSC Staff Mr. Ben Poulet) emails regarding any aspect of the Trend Analysis required. 2a) Provide to CNSC Staff the CNSC Staff conducted Trend Analysis: Provide any documentation of Trend Analysis circulation and its CNSC Staff circulation scope. 2b) And provide information of Trend Analysis circulation to Mr. Ben Poulet, Country Coordinator (Canada) or CNSC Staff Member replacing him.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00198

DONE on March 6, 2021 at 12:42 a. m. 24 days in March 6 days April Total of 30 days on April 6 The following is regarding a Reportable Event(RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. The Turbine Trip Procedure Nuclear Power Plant Staff review was required. The IAEA Staff from the IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information: We kindly request the following information be provided to us in the same format, in three Sections, and as soon as the Section information is available: Four Information Sections ANO Delegated Task(s): 1) Used Turbine Trip procedure (UTTP) during the Reportable Event with signing authorities and markup, positions, and markups. If the procedure was not used provide a copy that included in the Reportable Event File assembled by the CNSC Site Inspectors. Provide Edoc Number of the UTTP. 2) Temporary Turbine Trip procedure (TTTP) immediately after the RE with signing authorities, positions. Provide Edoc Number of the TTTP. 3) New and Authorized Turbine Trip procedure (NATTP) and improved procedure approved for use with signing authorities, positions. Provide Edoc Number of the NATTP. 4) Any records of UTTP, TTTP, or NATTP Simulator testing, commissioning work, training, and changes.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00199

Regarding a Reportable Event (RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. Requesting: NPP Root Cause Analysis Program and its review, issued by Nuclear Power Plant Staff. NPP Root Cause Analysis Program implementation documentation. IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information: We kindly request the following information be provided to us in the same format, in three Sections, and as soon as the Section information is available: Licensee information review of its is requested: 1) Used Root Cause Analysis procedure (URCAP) at the time of the Reportable Event with signing authorities and markup, and positions. Provide Edoc URCAP #. 2) Reviewed Root Cause Analysis procedure (RRCAP) issued after the Reportable Event with signing authorities and markup, and positions; provide Change Control Items. Provide Edoc RRCAP #. 3) Authorized for use the New Root Cause Analysis procedure (NRRCAP) after the Reportable Event with signing authorities and markup, and positions; provide Change Control Items and NPP Management changes. Provide Edoc NRRCAP #. 4) (Implementation documentation of the authorized New Root Cause Analysis Program IDANRCAP). Provide Edoc IDANRCAP #. 5) Action Tracking Number (ATN) of the Country Coordinator (Canada, Mr. Ben Poulet, CNSC Staff). Provide Edoc ATN #. Provide a ATN database copy.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00200

The following is regarding a Reportable Event (RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. Evaluation of the Turbine-Generator Monitoring Protection Scheme is requested by the IAEA Staff. IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information and create an Action Item: We require that you provide the following documents: 1) Action Item Number created by the Country Coordinator (Canada, Mr. Ben Poulet, CNSC Staff) for the Evaluation of the Turbine-Generator Monitoring Protection Scheme. 2) Action Item Number Database 3) Evaluation documentation requested of the Turbine-Generator Monitoring Protection Scheme (TGMPS). Provide Edoc Number of the TGMPS. 4) Implementation Measures documentation (IMD) requested by IAEA Staff or submitted for Refurbishment Licensing or at any other time. Provide Edoc Number of the IMD.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2019-00084

Please provide documents detailing and/or used to track action items or issues that should be followed up on related to the Pickering Nuclear Generating Station. The timeframe is 2019.

Organization: Canadian Nuclear Safety Commission

139 page(s)
February 2020

Req # A-2019-00102

Any briefing materials (i.e. briefing notes, decks) regarding radioactivity of brine extracted through hydraulic fracturing and the health and safety implications of the same from January 2018 to January 2020. Please send digital copies of all correspondence (acknowledgment and any required notices of extension) as well as hard copies.

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020

Req # A-2019-00109

All records provided to or created by the president regarding nuclear power plant refurbishment from Nov. 10, 2019 to the date this request was received.

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020

Req # A-2019-00110

Royal Bank of Canada (the "Lender") l/t Branthaven Marz Inc. (the "Borrower/Registered Owner") 121 Highway 8, Hamilton. Ontario L8G 1C1 being Part of Lot 2, Plan 772 being Part 1, Plan 62R-20609 save and except Part 3, Plan 62R-12432, Hamilton, Ontario as described in PIN 17315-0313 (LT) (the "Property") Roll No.: 2518050 - 47105100 Closing Date: As soon as possible We would like to request a records search pursuant to the Access to Information Act. Please conduct a file search for the Property and advise if you have record of any nuclear substances, work orders, deficiency notices, violations, remedial orders, or any other outstanding requirements with respect to the Property and its surrounding soil and groundwater. Please also advise if the Property is in close proximity (within 76 meters) to a nuclear reactor, particle accelerator, uranium or thorium mill, a facility for processing nuclear reactor fuel, or any facility that produces, disposes, or otherwise possesses radioactive prescribed substances or materials as described in the Nuclear Safety and Control Act and the Atomic Energy Control Act. Our File No.: 3933 227

Organization: Canadian Nuclear Safety Commission

0 page(s)
February 2020

Req # A-2019-00111

provide the total amounts spent on advertising for budget year 2018-2019 on a month to month basis, separating for production and media placement costs.

Organization: Canadian Nuclear Safety Commission

1 page(s)
February 2020

Req # A-2019-00113

Please provide the list of advertising purchases (titles, purpose of advertising, vendor) purchased by the department for budget year 2018-2019 on a month to month basis.

Organization: Canadian Nuclear Safety Commission

3 page(s)