Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Report Type

Organization

Disposition

Year

Month

Found 63871 record(s)

Req # A-2020-00192

Please provide On October 27, 2009, 1-Gentilly II Nuclear Power Plant applicable License, 2-License Conditions, 3-License Amendments (reasons for changes), 4-Proceedings including Reporting Requirements R-99/S-99, and 5-supporting Records for Amendment proceedings.

Organization: Canadian Nuclear Safety Commission

95 page(s)
March 2020

Req # A-2020-00193

MAPLE BROOK ACQUISTIONS INC. (the “Purchaser”) purchase from 2606912 ONTARIO LTD. (the “Vendor”) of the lands and premises municipally known as 298 Pretty River Parkway, Collingwood, ON L9Y 4J5 and legally described as set out in Schedule “A” attached hereto (the “Property”) Closing Date: As soon as possible Our File No.: 12310-002

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00194

The minutes of the CNSC’s Management Committee for January 2021.

Organization: Canadian Nuclear Safety Commission

3 page(s)
March 2020

Req # A-2020-00197

The following is regarding a Reportable Event that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. The following was required by the IAEA Staff from the IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) or the CNSC Staff: Conduct a Trend Analysis: IAEA Staff required that a for the be provide to IAEA Staff and the Trend Analysis be circulated to CNSC Staff. We kindly request the following information be provided to us in the same format, in five Sections, and as soon as the Section information is available: Five Information Sections 1a) Please provide conducted Trend Analysis. And provide the Trend Analysis data collected for the year 2000-2010 period. And provide the Trend Analysis circulation documentation and the scope of circulation. 1b) And the Trend Analysis data collected via the NPP Quality Program, Analysis Timeline, and reports shared with CANDU Owners Group, including Pointe Lepreau Nuclear Power Plant Management and Owners. 1c) And the IAEA Country Coordinator (Canada, CNSC Staff Mr. Ben Poulet) emails regarding any aspect of the Trend Analysis required. 2a) Provide to CNSC Staff the CNSC Staff conducted Trend Analysis: Provide any documentation of Trend Analysis circulation and its CNSC Staff circulation scope. 2b) And provide information of Trend Analysis circulation to Mr. Ben Poulet, Country Coordinator (Canada) or CNSC Staff Member replacing him.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00198

DONE on March 6, 2021 at 12:42 a. m. 24 days in March 6 days April Total of 30 days on April 6 The following is regarding a Reportable Event(RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. The Turbine Trip Procedure Nuclear Power Plant Staff review was required. The IAEA Staff from the IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information: We kindly request the following information be provided to us in the same format, in three Sections, and as soon as the Section information is available: Four Information Sections ANO Delegated Task(s): 1) Used Turbine Trip procedure (UTTP) during the Reportable Event with signing authorities and markup, positions, and markups. If the procedure was not used provide a copy that included in the Reportable Event File assembled by the CNSC Site Inspectors. Provide Edoc Number of the UTTP. 2) Temporary Turbine Trip procedure (TTTP) immediately after the RE with signing authorities, positions. Provide Edoc Number of the TTTP. 3) New and Authorized Turbine Trip procedure (NATTP) and improved procedure approved for use with signing authorities, positions. Provide Edoc Number of the NATTP. 4) Any records of UTTP, TTTP, or NATTP Simulator testing, commissioning work, training, and changes.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00199

Regarding a Reportable Event (RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. Requesting: NPP Root Cause Analysis Program and its review, issued by Nuclear Power Plant Staff. NPP Root Cause Analysis Program implementation documentation. IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information: We kindly request the following information be provided to us in the same format, in three Sections, and as soon as the Section information is available: Licensee information review of its is requested: 1) Used Root Cause Analysis procedure (URCAP) at the time of the Reportable Event with signing authorities and markup, and positions. Provide Edoc URCAP #. 2) Reviewed Root Cause Analysis procedure (RRCAP) issued after the Reportable Event with signing authorities and markup, and positions; provide Change Control Items. Provide Edoc RRCAP #. 3) Authorized for use the New Root Cause Analysis procedure (NRRCAP) after the Reportable Event with signing authorities and markup, and positions; provide Change Control Items and NPP Management changes. Provide Edoc NRRCAP #. 4) (Implementation documentation of the authorized New Root Cause Analysis Program IDANRCAP). Provide Edoc IDANRCAP #. 5) Action Tracking Number (ATN) of the Country Coordinator (Canada, Mr. Ben Poulet, CNSC Staff). Provide Edoc ATN #. Provide a ATN database copy.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2020-00200

The following is regarding a Reportable Event (RE) that occurred at a Canadian Nuclear Power Plant on October 27, 2009, at 12:11. Evaluation of the Turbine-Generator Monitoring Protection Scheme is requested by the IAEA Staff. IAEA Country Coordinator (Mr. Ben Poulet, CNSC Staff, Canada) was to obtain the following information and create an Action Item: We require that you provide the following documents: 1) Action Item Number created by the Country Coordinator (Canada, Mr. Ben Poulet, CNSC Staff) for the Evaluation of the Turbine-Generator Monitoring Protection Scheme. 2) Action Item Number Database 3) Evaluation documentation requested of the Turbine-Generator Monitoring Protection Scheme (TGMPS). Provide Edoc Number of the TGMPS. 4) Implementation Measures documentation (IMD) requested by IAEA Staff or submitted for Refurbishment Licensing or at any other time. Provide Edoc Number of the IMD.

Organization: Canadian Nuclear Safety Commission

0 page(s)
March 2020

Req # A-2019-00025

Information regarding major telecommunications disruptions and service outages in the Atlantic Provinces.

Organization: Canadian Radio-television and Telecommunications Commission

170 page(s)
March 2020

Req # A-2019-00029

All communications between telecommunications companies and the CRTC regarding technical disruptions and failures following Hurricane Dorian. Dates from September 7, 2019 to November 18, 2019.

Organization: Canadian Radio-television and Telecommunications Commission

170 page(s)
March 2020

Req # A-2019-00033

All records pertaining to the December 2019 report regarding how a decrease in wireless revenues would hurt the deployment of 5G in Canada.

Organization: Canadian Radio-television and Telecommunications Commission

63 page(s)
March 2020
Date modified: