Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 120 record(s)

Req # A-2020-00020

ISTB Engineering Change Requests Assessments, including comments, that were Rejected Over the entire ISTB System lifetime, the Rejected ISTB Engineering Change Request Assessments, including Assessors comments; Names, titles, and P. Eng. numbers of…

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00021

ISTB Engineering Change Request Assessments, including comments, that were Accepted Over the entire ISTB System lifetime, the Accepted ISTB Engineering Change Notice Request Assessments, including comments; Names, titles, and P. Eng. numbers of the…

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00022

2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers;…

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00023

3.0 ISTB DESIGN OWNERSHIP TURNOVER BETWEEN AECL AND SNC LAVALLIN List of AECL Design Engineers’ titles and OPG ISTB Design Engineers’ titles at the time of the ISTB Design change of ownership occurred and after the Blackout dates of August 14-28th,…

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2019-00130

Confirmation document, email sent to the Technical Specialist(s) covering the Safety Areas mentioned in the Detailed Event Report for the event that occurred 27 October, 2009, at Gentilly II Nuclear Power Plant for the following three instances, id…

Organization: Canadian Nuclear Safety Commission

0 page(s)
April 2020

Req # A-2019-00132

Clarified text on April 17, 2020: Emails were to be sent to Specialist(s), as follows: Safety Systems, Training Programs, Human Factors, and Quality Assurance. The causes identified in the preliminary and detailed reports describes a minimum…

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00131

Confirmation document, email, containing at least two Reports were sent to the Technical Specialist(s) covering Shutdown System(s) and Safety Systems, deemed qualified, and preparing the Gentillly II Nuclear Power Plant Integrated Safety Review (ISR…

Organization: Canadian Nuclear Safety Commission

3 page(s)
April 2020

Req # A-2019-00103

Provide January 1, 2019 to present, review of the handling work of Canada’s federally-owned radioactive waste by a private-sector consortium and options to consider as the renewal date in 2021 is near, including other options that store radioactive…

Organization: Canadian Nuclear Safety Commission

103 page(s)
April 2020

Req # A-2019-00108

All records provided to or created by the president regarding the Pickering nuclear generating station from Jan. 1, 2020 to the date this request was received.

Organization: Canadian Nuclear Safety Commission

33 page(s)
April 2020

Req # A-2019-00123

For the years 2007 and 2008, the Gentilly II CNSC Site Office Inspector Report regarding the Gentilly II Nuclear Power Plant activities for years 2007 and 2008. Please note that terminology used in this request is standard nuclear industry…

Organization: Canadian Nuclear Safety Commission

451 page(s)
April 2020
Date modified: