Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 222 record(s)

Req # A-2022-00123

During a presentation on Nov. 3, 2022, CNSC staff delivered a risk assessment relating to deterioration of pressure tubes. CNSC staff concluded that Level 3 Defence in Depth "is not adversely afffected by the type of pressure tube failure that could potentially result from reduced fracture toughness." Also, they determined that "the increase in risk metrics such as severe core damage frequency (CDF) and large release frequency (LRF) due to postulated increases in pressure tube failure frequency is negligible for 2-3 years of continued operations." I request all reports or other documents possessed by the CNSC detailing how these conclusions were arrived at. I also request any memos, e-mails or other electronic communications discussing this risk assessment. Relevant dates would be Nov.1, 2021 to present.

Organization: Canadian Nuclear Safety Commission

973 page(s)
August 2023

Req # A-2023-00027

All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in May 2023.

Organization: Canadian Nuclear Safety Commission

313 page(s)
August 2023

Req # A-2023-00028

A list of action items produced by the CNSC’s Executive Team in May 2023. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Team has been briefed on in May 2023. Also include meeting minutes or agendas.

Organization: Canadian Nuclear Safety Commission

125 page(s)
August 2023

Req # A-2023-00041

I would like to request PDFs of the following briefing notes from January to May 2023: Internal Audit, Evaluation and Ethics Division Strategic Plan - For the Fiscal Years 2022-25 (6254290), CNSC signing onto NRCan’s Equal by 30 Campaign with commitments (6439339), Approval to proceed with public consultation on REGDOC-1.2.3, Licence Application Guide: Licence to Prepare Site for a Deep Geological Repository (6848782), Overview of Labour Relations Trends (as of December 20, 2022) (6866688), CNSC 2023-24 Departmental Plan (6880897), Key Messages for Minister Wilkinson: International Harmonization (6915405), Concept Paper – Nuclear Roundtable on key issues impacting nuclear projects in Canada (6916442), International Conference on Effective Nuclear and Radiation Regulatory Systems: Preparing for the Future in a Rapidly Changing Environment (6926392), Meeting with Ontario Minister of Energy Todd Smith (6942724), Meeting with Chiefs of Clearwater River, Buffalo River, and Birch Narrows Dene Nations and CEO of NexGen Energy Ltd (6953268), Meeting with NB Power Board of Directors (6955507), Indigenous Advisory Council for the SMR Action Plan Meeting (6976536), Consultations with the Provinces and Indigenous Communities (Recommendations 6, 7, and 8) (6998139), 1st EQUALITY PLAN of the Nuclear Safety Council - Period 2023-2026 (7026792), Results of the survey on career paths and the place of women at ASN (7026794), Role of Gender Equity and Inclusion: 20 years of progress of the Code of Conduct on Safety and Security of Radioactive Sources (7034389), Meeting #6 – IGC-IG on Gender Equality in Nuclear Regulatory Agencies (7044921), SMR projects/vendor design reviews in Canada (7016750), SaskPower Special Project Service Agreement (7005387).

Organization: Canadian Nuclear Safety Commission

165 page(s)
August 2023

Req # A-2023-00017

A list of action items produced by the CNSC’s Executive Team in April 2023. Include any briefing materials including and not limited to: briefing notes, information notes, scenario notes; anything that the Executive Team has been briefed on in April 2023. Also include meeting minutes or agendas.

Organization: Canadian Nuclear Safety Commission

173 page(s)
July 2023

Req # A-2023-00018

All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in April 2023.

Organization: Canadian Nuclear Safety Commission

386 page(s)
July 2023

Req # A-2023-00019

provide copies of the following briefing notes, providing interim disclosure as each is prepared for release: * 6628301 — Meet and Greet with the Executive Team * 6909304 — Approval of Service Agreement – Clean Core Thorium Energy Fuel Preliminary Assessment * 6955507 — Meeting with NB Power Board of Directors * 6958790 — The Role of the President: It’s 2 jobs in one! * 6990161 — Poland’s National Atomic Energy Agency (PAA) * 6996360 — Briefing Note to the President CNSC/OPG/NRC/TVA/GEH Meeting * 6998145 — Funding Support towards small modular nuclear reactors (Recommendations 1, 2, and 5) * 6998164 — Nuclear research and development for small modular nuclear reactors, including waste management (Recommendations 3 and 4) * 7018416 — Canadian Nuclear Safety Commission Readiness for Small Modular Reactors and Innovation

Organization: Canadian Nuclear Safety Commission

73 page(s)
July 2023

Req # A-2023-00024

Provide the final acknowledgment from the CNSC that the Class IA nuclear facility known as the Pool Test Reactor at the Chalk River Laboratories has been decommissioned including the final application for licence to decommission the same and the final licensing decision by the Commission.

Organization: Canadian Nuclear Safety Commission

170 page(s)
July 2023

Req # A-2023-00025

Provide every final Harassment and Violence investigation report completed between April 1, 2021 to March 31, 2023. These reports are prepared in accordance with the Work Place Harassment and Violence Prevention Regulations. They are typically held by Human Resources officials (e.g., OHS, Labour Relations, Values and Ethics) in headquarters and regions. Section 30 (2) of the Work Place Harassment and Violence Prevention Regulations states that: "An investigator’s report must not reveal, directly or indirectly, the identity of persons who are involved in an occurrence or the resolution process for an occurrence under these Regulations." As such, there should be little to no ATIP vetting required as these reports are already anonymized.

Organization: Canadian Nuclear Safety Commission

20 page(s)
July 2023

Req # A-2022-00067

All briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the President in August 2022.

Organization: Canadian Nuclear Safety Commission

331 page(s)
June 2023
Date modified: