Completed Access to Information Requests

About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA).

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 67 record(s)

Req # A-2020-00016

Final decisions for ATO, including context and restrictions, documentation, approvals, and authorizations for the ISTB System in-place at the time of the Blackout. Final decision for AFS, including restrictions, Engineers comments, and identified risk(s), documentation and authorizations. Final decision for AFS sent to OPG Power Central dispatch for Spinning Reserve assessments, and Bulk Electricity Supply stability assessments. Blackout Dates August 14th-28th, 2003.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00017

ISTB Available to Operate (ATO) Documentation and Available For Service (AFS) Final decision for AFS sent to OPG Power Central dispatch for Spinning Reserve assessments, and for Bulk Electricity Supply stability assessments. The information that OPG sent for the NERC Assessment of the Control Area(s)(CAs) affected by the ISTB System Design; the CAs are the ones affected by the Lake Ontario Bulk Electricity Supply Systems affected by the PNGS NPPs Supply reliability. The ATO and AFS documentation for all versions of ISTB; the Voltage and Current testing and measurements conducted to determine acceptable functionalities. Black-out-dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

124 page(s)
July 2020

Req # A-2020-00020

ISTB Engineering Change Requests Assessments, including comments, that were Rejected Over the entire ISTB System lifetime, the Rejected ISTB Engineering Change Request Assessments, including Assessors comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00021

ISTB Engineering Change Request Assessments, including comments, that were Accepted Over the entire ISTB System lifetime, the Accepted ISTB Engineering Change Notice Request Assessments, including comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Notice Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00022

2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers; including DO(s)’ Design Intent(s); Titles, Names, and P. Eng. affiliations, P. Eng. Numbers, of the ISTB System Design Engineers; DO(s), title, name, and P. Eng. Number, of the ISTB System; and DO(s) of the ISTB System when the System was Commissioned; and was deemed Ready to Operate (RTO). Blackout Period: between August 14–28, 2003, beginning just after 4:10 p.m. EDT.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00023

3.0 ISTB DESIGN OWNERSHIP TURNOVER BETWEEN AECL AND SNC LAVALLIN List of AECL Design Engineers’ titles and OPG ISTB Design Engineers’ titles at the time of the ISTB Design change of ownership occurred and after the Blackout dates of August 14-28th, 2003; ISTB Design ownership change date; ISTB Design Turnovers documentation exchange list, including Design Intent(s), between ISTB System DEs; please include DE Titles, Names, and P. Eng. affiliations, and P. Eng. Numbers, of the Design Engineers.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # 1025-2020-008570

All briefing notes, correspondence (emails), presentations, reports and studies provided to or sent by the commissioner or deputy commissioner from Jan. 1, 2020, to May 25, 2020, regarding the coming into force of sections 344 to 347 of the Budget Implementation Act, 2018, No. 2. These sections include those that increased the level of fines the FCAC may impose and the requirement to name violators.

Organization: Financial Consumer Agency of Canada

47 page(s)
July 2020
Date modified: