Completed Access to Information Requests

Follow:

  • RSS
  • Cite
About this information

Search the summaries of completed Access to Information (ATI) requests to find information about ATI requests made to the Government of Canada after January 2020. If you find a summary of interest, you can request a copy of the records at no cost using the form below each summary. Requests made through this form are considered informal requests and are not subject to the same requirements as requests under the Access to Information Act (ATIA). For additional information, please see the “About Access to Information Requests” webpage.

If you don’t find what you are looking for you can request additional government records under an institution’s control by contacting the institution’s Access to Information and Privacy Coordinator or by submitting a formal access to information request.

*All information provided will incorporate the necessary exemptions and exclusions as per the Access to Information Act and the Privacy Act.

Download datasets of the summaries of completed access to information requests.

Current Search

Report Type

Organization

Disposition

Year

Month

Found 593 record(s)

Req # A-2020-00017

ISTB Available to Operate (ATO) Documentation and Available For Service (AFS) Final decision for AFS sent to OPG Power Central dispatch for Spinning Reserve assessments, and for Bulk Electricity Supply stability assessments. The information that OPG sent for the NERC Assessment of the Control Area(s)(CAs) affected by the ISTB System Design; the CAs are the ones affected by the Lake Ontario Bulk Electricity Supply Systems affected by the PNGS NPPs Supply reliability. The ATO and AFS documentation for all versions of ISTB; the Voltage and Current testing and measurements conducted to determine acceptable functionalities. Black-out-dates August 14-28, 2003.

Organization: Canadian Nuclear Safety Commission

124 page(s)
July 2020

Req # A-2020-00020

ISTB Engineering Change Requests Assessments, including comments, that were Rejected Over the entire ISTB System lifetime, the Rejected ISTB Engineering Change Request Assessments, including Assessors comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00021

ISTB Engineering Change Request Assessments, including comments, that were Accepted Over the entire ISTB System lifetime, the Accepted ISTB Engineering Change Notice Request Assessments, including comments; Names, titles, and P. Eng. numbers of the Engineers that have Accepted ISTB Engineering Change Notice Request; include the Engineering Change Requests Assessment related documentation.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00022

2.0 ISTB Design Owners AFTER THE BLACKCOUT List of ISTB System Designs Owners’ (DO) Names and Ownership Period after the Blackout; ISTB System Design Turnovers documentation, exchange of documents between DOs, that were exchanged at turnovers; including DO(s)’ Design Intent(s); Titles, Names, and P. Eng. affiliations, P. Eng. Numbers, of the ISTB System Design Engineers; DO(s), title, name, and P. Eng. Number, of the ISTB System; and DO(s) of the ISTB System when the System was Commissioned; and was deemed Ready to Operate (RTO). Blackout Period: between August 14–28, 2003, beginning just after 4:10 p.m. EDT.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2020-00023

3.0 ISTB DESIGN OWNERSHIP TURNOVER BETWEEN AECL AND SNC LAVALLIN List of AECL Design Engineers’ titles and OPG ISTB Design Engineers’ titles at the time of the ISTB Design change of ownership occurred and after the Blackout dates of August 14-28th, 2003; ISTB Design ownership change date; ISTB Design Turnovers documentation exchange list, including Design Intent(s), between ISTB System DEs; please include DE Titles, Names, and P. Eng. affiliations, and P. Eng. Numbers, of the Design Engineers.

Organization: Canadian Nuclear Safety Commission

0 page(s)
July 2020

Req # A-2019-00076

provide all briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the president in 2019.

Organization: Canadian Nuclear Safety Commission

1299 page(s)
June 2020

Req # A-2019-00112

Any documents, correspondence and materials related to Plutonium found in the sewage lagoon of AECL's Whiteshell Laboratories during the timeframe of 2000-2020. Originally documented on (p.4-26) from CNL’s Annual Compliance Monitoring Report 2018 Progress Report on the Environmental Assessment Follow-Up Program for Whiteshell Laboratories Whiteshell Site Documentation.

Organization: Canadian Nuclear Safety Commission

1484 page(s)
June 2020

Req # A-2019-00128

Confirmation documents (2): for example, database printout that includes the Preliminary Event Details, CNSC Officer Title that entered the data, and the date of entry of Preliminary Event Details information, that the Directorate of Nuclear Cycle and Facilities Regulation Director General, such as Mr. P. Elder, Director General, and any of the Directorate staff members or the staff members working under the Vice President Technical Support and Chief Science Officer, had had access to via CNSC CERTS Database Preliminary Report for the event that occurred on October 27, 2009 at Gentilly II Nuclear Power Plant. Please note that terminology used in this request is standard nuclear industry terminology.

Organization: Canadian Nuclear Safety Commission

2 page(s)
June 2020

Req # A-2019-00152

Please provide all briefing materials, including and not limited to briefing notes, information notes, scenario notes, prepared and/or provided to the president in January 2020.

Organization: Canadian Nuclear Safety Commission

186 page(s)
June 2020

Req # A-2019-00166

Provide the minutes of the CNSC's management committee for February 2020.

Organization: Canadian Nuclear Safety Commission

4 page(s)
June 2020
Date modified: